Analisis Penjadwalan Produksi Pembuatan Rodding System Point untuk Meningkatkan Produktivitas Produksi di PT. Smart Teknik Utama

Authors

  • M Syafaruddin Mahaputra

DOI:

https://doi.org/10.30999/medinus.v18i2.1239

Abstract

A company activity does not escape methods to optimize production that have been researched and designed in order to minimize all errors and deficiencies that occur in production activities. One of the important activities in industrial competition in today’s global market is making designs in scheduling production activities so that companies can minimize production costs and speed up production time to achieve efficiency and effectiveness of production operations and achieve production targets. PT Smart Teknik Utama was established on March 11, 1989. On July 10, 1994 PT Smart Teknik Utama received assistance and a soft capital loan from BUMN, namely PT LEN Industri (Persero), the Production Division experienced delays in fulfilling orders from consumers due to the scheduling method. which is less adjusted to the time when the contract arrives and the time to fulfill the due date of each order, the research objective of this final project is to increase work effectiveness and be able to precisely control and design a production system that can regulate and support all aspects and resources owned so that efficient in the process of achieving optimal goals. Based on this, the company wants a proposed solution to correct delays in processing orders. This study proposes the First Come First Serve (FCFS) method, the Longest Processing Time (LPT) method, the Shortest Processing Time (SPT) method, the Early Due Date (EDD) method and the Analytic Hierarchy Process (AHP) method.

References

Arifi n dan Rudyanto. 2010. Penerapan Metode Earliest Due Date Pada Penjadwalan Produksi Paving Pada CV.EKO JOYO. ISSN 1907� 5022. Sekolah Tinggi Majemen Informatika Dan Teknik Komputer Surabaya.

Azizah, H. 2014. Penerapan Model Problem Based Learning Untuk Meningkatkan Pemahaman Matematis Dalam Menyelesaikan Masalah Pada Bilangan pecahan. Skripsi Fakultas Ilmu

Pendidikan Universitas Pendidikan Indonesia: Tidak diterbitkan.

Badan Pusat Statistik. 2010. Statistik Indonesia Tahun 2010. Jakarta Pusat : Badan Pusat Statistik diakses dari http://

www.bps.go.id/,pada tanggal 20 Juni 2020 pada jam 20.20 WIB.

Baker, K.R. dan Trietsch, D., 2009. Principles Of Sequencing And Scheduling, New

Baker, K.R. dan Trietsch, D., 2010. Production, Planning, Control, and Integration, MC Graw-Hill

Baker, K.R. dan Trietsch, D., 2011. Fundamental Of Operation Management Third Edition, McGraw-Hill.

Bedworth, dan Bailey. 2012. Penjadwalan Produksi Flow Shop Menggunakan Metode Campbell Dudek Smith (CDS)

dan Nawaz Enscore Ham (NEH). Salemba Empat, Jakarta

Chase Aquilano. 2009. Comparative Analysis of Heuristics for Mkespan Minimising in Flow Shop Scheduling. Haryana,

India.

Conway, S. Richard W. dan Burke, E. K. MEDIA usantara 123 Vol. XVIII No. 2 - Mei - Agustus 2021 2014. Logging Practices. Miller Freeman Publication, Inc.Washington.

Dewi, F.G. 2011. Penjadwalan Pembuatan Box Aluminium Untuk Meminimalkan Makespan. Prosiding SEMNAS, Institut Teknologi Sepuluh Nopember,Surabaya

Endang, R. 2018. Analisis Penjadwalan Produksi Menggunakan Metode Earliest Due Date (Edd).Pada CV. Rookie.Skripsi.

Erwandi, H. 2014. Analisa Penjadwalan Produksi Kusen, Pintu, Daun Jendela Dengan Metode First Come First Serve (FCFS), metode Longest Processing Time (LPT), Metode Shortest Processing Time (SPT), Metode Early Due Date (EDD). Pada Ud. Sinar Kamper. Skripsi.

Gaspersz. 2017. Modifikasi Mekanisme Penentuan Penjadwalan Job pada Metode Dannenbring, edisi 59, Salemba empat, Jakarta

Ginting. 2009. Penjadwalan Produksi Dengan Metode N-Job M-Mesin Untuk Meminimalisasi Makespan Pada PT.

Harapan Widyatama Pertiwi Untuk Pembuatan Pipa PVC [Jurnal]. ISSN 1412-3126. Fakultas Teknik, Univesitas Bina Nusantara, Jakarta

Ginting, 2010. Penjadwalan Mesin, Yogyakarta: Graha Ilmu Heizer, Jay dan Render Barry. 2014. Penjadwalan Produksi :Penentuan metode Earliest Due Date, edisi 11, Salemba

Empat, Jakarta.

Heizer. 2010. Perencanaan Penjadwalan Produksi pada PT. Harapan Widyatama Pertiwi untuk Produk Pipa PVC. Jakarta

Barat.

Kementerian Perindustrian Republik Indonesia (2010), tentang Penjadwalan Produksi industri. http://www.kemenperin.go.id/artikel/,6 324/(Diakses 5

Juni 2020)

Kostas N. 2010. Operational Management Production Planning and Control. Mc Graw Hill Book Company: New York.

Limanggus, H. 2015. Perbandingan Penjadwalan Produksi Job Shop Dengan Menggunakan Metode First Come First Serve (FCFS), dan Metode Early Due Date (EDD). Pada Akademi Teknik

Mesin Industri Cikarang. Skripsi.

Nugeraha. 2017. Manajemen Produksi dan Operasi : Konsep dan Kerangka Dasar. Penerbit Citra Media, Surabaya.

Pinedo. 2012. Scheduling, Theory, Algorithms, and System. Edisi keempat. New York, USA.

Richard. 2012. Scheduling, Theory, Algorithms:

McGraw-Hill

Riduwan. 2010. Rumus dan Data dalam Analisis Statistika Cetakan kedua. Alfabeta Safitri, M. 2019. Analisis Penjadwalan

Produksi Dengan Metode First Come First Serve (FCFS) Pada Nvn Konveksi Di Kota Malang. Skripsi.

Sudoryono. 2010. Penjadwalan Mesin.Yogyakarta : Graha Ilmu

Sugiyono. 2013. Statistika Untuk Penelitian. Bandung: Alfabeta.

Published

2021-06-19

How to Cite

Mahaputra, M. S. (2021). Analisis Penjadwalan Produksi Pembuatan Rodding System Point untuk Meningkatkan Produktivitas Produksi di PT. Smart Teknik Utama. Media Nusantara, 18(2), 109–124. https://doi.org/10.30999/medinus.v18i2.1239

Issue

Section

Artikel

Citation Check